Application temperature: from +10°C
Service temperature: from –18°C to +49°C
Open time: 15 min.
Tools: Mason's trowel
Removing excess: Water-dampened cloth
Coverage: approximately 1.5 m² per litre
Preparation: Surfaces must be dry and completely free from substances that could interfere with adhesion.
Application steps: Allow the adhesive and materials to acclimatise to room temperature for 24 hours before installation. Note: Do not use when air, adhesive or materials are below 10°C.
Using the buttering method, coat a generous area at each tile corner with a thin layer. Then apply 25–38 mm mounds of adhesive, roughly golf-ball size, 50–75 mm from the corners on the back of the tile.
Immediately press the tile into place, moving it back and forth by 13 mm to flatten the adhesive mounds to about 5 mm thick and 64 mm in diameter.
For interlocking tiles, do not slide the tile into the adjoining groove until it has been pressed to the correct level against the ceiling.